Climate change & 4M

Written by

Published on

February 25, 2021

Industry Insights
Natural DisasterNatural Disaster

The climate is changing, and in the past year we have felt its wrath in the form of natural disasters.

In California we have witnessed terrible wildfires, burning through the state for months on end, creating over $12 billion in damages, and disconnecting hundreds of thousands of citizens from their most basic utilities.

2020’s Atlantic Hurricane season named 30 storms, causing $37billion in damages, mainly to infrastructure. And just last week an immense snowstorm hit Texas, leaving over 4 million citizens without electricity.

This new era is coercing humanity to take action and protect the most crucial infrastructures of our everyday lives.

In order to cope with these natural disasters, a growing number of businesses and local authorities have suggested and decided to bury their utilities.

This was found to be an ideal solution that is able to protect such essentials during extreme climate events such as wildfires, tornados, floods, and others. Unfortunately, most utility owners / stakeholders have yet to bury their assets, as it is significantly more expensive than leaving them above ground.

According to a study conducted by PG&E, one of the largest utility companies in the US, above ground costs of setting up utility infrastructure are estimated at $10 per foot. On the other hand, underground costs, burying the infrastructure, may cost $20-40 per foot – up to four times more than above ground costs.

One of the most significant hurdles, from both a time and cost perspective, are the SUE activities - mapping the subsurface in order to make sure that there aren’t any utilities that could be damaged in the excavation process.

This assignment is extremely demanding, as it relies on old and inaccurate blueprints, field investigations, geophysical locating, and utility exposing. This is a set of procedures that is easily affected by both human error and nature’s characteristics (weather, terrain, etc.), making this process difficult to predict in regard to time, cost, and overall success.

In other words, it is very difficult for utility owners to commit to plans of utility burying, when any small mistake or unplanned event can damage their supply to millions of Americans.

This is precisely where 4M provides solutions, as it makes manual records - redundant, field investigations – automated, geophysical locating – scalable, and the need for utility exposing – minimized.

Its combination of remote sensing, AI, and computer vision generates a mapping simulation engine that gives utility owners and stakeholders an accurate & up-to-date description of the subsurface terrain. It’s a comprehensive, detailed utility map of the known and unknown utilities in the subsurface, thus preventing unexpected costs, budget overruns, infrastructure damages and schedule delays in such projects.

If there is a key to unearthing critical utilities – it is probably 4M, as the company makes sense of what has become a complex environment that conceals countless miles of man-made infrastructure. The company makes sense of the underearth.

Recent blog posts

View all Blogs

A Utility Strike Is Not an Accident

4M’s 8/11 Day position on how to better protect America’s underground infrastructure

Itzik Malka

August 11, 2026

Company News

Utility Damages Are Rising — And the Fix is Simple, But Not Easy

Three years into a five-year industry pledge to cut utility damages in half, the 2025 DIRT Report shows they’re actually rising. We asked 150+ infrastructure leaders in New York why, and what the industry can do to get the numbers moving in the right direction.

Chris Garafola

August 10, 2026

Industry Insights

Here's What's New in 4M: July 2026

July brought two updates that give teams more visibility and more ground to work with: a new Admin Dashboard for tracking usage and adoption at a glance, and Foundation Data live in Massachusetts, another step on 4M's path to nationwide coverage by the end of the year. Here's what's new.

Nicole Heger

July 31, 2026

Product

Historic, Dense, and Getting Busier: How New York Is Rethinking Utility Damage Prevention

New York Build Better Utility Workshop (Recap)

Chris Garafola

July 15, 2026

AI Innovation

Here's What's New in 4M: June 2026

DGN export is now available, rounding out 4M's CAD Auto Generation offering and completing the format trifecta that AEC and DOT workflows depend on.

Nicole Heger

July 7, 2026

Product

Our Newsletter

Join 7k infrastructure professionals

Get monthly insights on ways to build
smarter, faster and safer with Utility AI.